Exempt granny-flat construction and completion records

Collect the project evidence as work happens and prepare the council completion pack.

01/

Before construction — open one project record

Keep the PIM, people, design basis, deadlines and monitoring plan together.

  1. Retain the issued PIM and application

    Keep the issued PIM, Form 2AA application and everything supplied to council.

    Required evidence PIM and application file

  2. Record both pathways separately

    Keep the Building Act exemption assessment separate from the RMA planning assessment.

    Required evidence Two dated decisions

  3. Identify the current design set

    Record the drawings, specifications, calculations and revision that will be built.

    Required evidence Dated design register

  4. Record licensed people and scopes

    Keep responsibility, contracts and licence or registration details for each regulated scope.

    Required evidence People and scope register

  5. Agree the monitoring plan

    Name the checks, evidence and responsible person before work begins.

    Required evidence Monitoring schedule

  6. Diary the two-year PIM deadline

    Set the completion deadline and an earlier decision date for any extension request.

    Required evidence Project calendar entry

02/

During construction — collect evidence before it disappears

Capture covered work, variations and practitioner records as each stage finishes.

  1. Take dated site photographs

    Identify the location and design detail before work is covered.

    Required evidence Stage photo folders

  2. Retain professional monitoring reports

    Keep the evidence promised in the monitoring plan without calling it a council inspection.

    Required evidence Signed reports

  3. Keep product and test records

    Retain product information, warranties, tests and producer statements relevant to the design.

    Required evidence Product evidence register

  4. Approve and draw every variation

    Record the instruction, reason, cost and updated drawing or specification.

    Required evidence Variation register

  5. Request trade records as scopes finish

    Do not wait until the project deadline to collect regulated documents.

    Required evidence Document tracker

03/

At completion — assemble and submit the final pack

Confirm the statutory records, accurate final plans and evidence of submission.

  1. Collect applicable LBP and trade records

    Obtain Records of Work and applicable plumbing, drainlaying, electrical and gas records.

    Required evidence Practitioner certificates

  2. Obtain design Certificates of Work

    Collect the applicable certificates for restricted design work.

    Required evidence Certificate or Certificates of Work

  3. Make final plans match the completed work

    Include every variation and the final plumbing and drainage as-builts.

    Required evidence Final as-built set

  4. Send the completion pack to the PIM council

    Submit within the statutory period and keep evidence of receipt.

    Required evidence Council receipt

  5. Resolve any Form 3A payment

    Record the due date and proof of payment for any development contribution.

    Required evidence Payment record

  6. Store the permanent owner copy

    Keep final records, warranties, contracts and maintenance information together.

    Required evidence Archived completion file